1 |
SPM2 Replacement Project |
Oct 2023 - Jul 2024 |
Brunei Shell Petroleum Co Sdn Bhd |
Supply engineering work, supply of materials, fabrication, load-out, decommission, installation and commissioning of one (1) SPM2 (single point mooring bouy) for Brunei Shell Petroleum Sdn Bhd at the shoreline of Brunei Darulsalam. |
2 |
Provision EPCIC of LCOT Effluent Discharge Pipeline Replacement Project |
2016 - 2019 |
SABAH SHELL Petroleum Company/ SARAWAK SHELL Bhd./ SEA HIBISCUS Sdn. Bhd. |
- Detailed design for procurement, construction, installation and commissioning engineering
- Procurement and supply including transportation of permanent E7items i.e. HDPE Pipe, concrete ballast & etc.
- Provision of marine vessel
- Pre-trenching (KP0 – KP0.267 : min 1m TOP cover, KP0.267 – KP0.317 : 0m to min. 1m TOP cover)
- Construction & installation – site preparation, pipeline assembly, offshore/ outfall pipeline installation – pipeline stringing and surface tow method, diffuser Installation, Perform Leak Test (0.875MPa)
- Decommissioning and removal:
- Commissioning
|
3 |
Provision of Production Riser Tensioner (PRT) Overhaul, Maintenance and Upgrade for Murphy’s Production Operations |
2016 – 2019 |
MURPHY Sarawak Oil Co. Ltd |
Inspection and overhaul of KIKEH production and drilling riser tensioner including modification, preventive maintenance, provision of lab testing, preparation of workshop area and preparation of work installation procedures. |
4 |
Transportation and Installation of Offshore Facilities for Year 2014 – 2016 (Package A) |
2016 |
PETRONAS Carigali Sdn Bhd |
BARDEGG & BARONIA Pipeline 24” x 125km DNCPP-B to E11RC Project (pipe-lay, sub-sea spool/ riser installation, pigging, cleaning, gauging and hydro-testing).. |
5 |
Transportation and Installation of Offshore Facilities for Year 2014 – 2016 (Package A) |
2016 |
PETRONAS Carigali Sdn Bhd |
BARDEGG & BARONIA Pipeline 24” x 43km TTJT-A to BNCPP-B Project (pipe-lay, sub-sea spool/ riser installation, pipeline crossing installation, pigging, cleaning, gauging and hydro-testing). |
6 |
Transportation and Installation of Offshore Facilities for Year 2014 – 2016 (Package A) |
2016 |
PETRONAS Carigali Sdn Bhd |
Eleven (11) nos. of SKO Riser Guards Project. |
7 |
Transportation and Installation of Offshore Facilities for Year 2014 – 2016 (Package A) |
2014 - 2015 |
PETRONAS Carigali Sdn Bhd |
SKO PL381 (10in dia. x 20.5km TKP - A to WLDP - C) Project (pipe-lay, sub-sea spool/ installation, pipeline crossing installation, pigging, cleaning, gauging and hydro-testing). |
8 |
Transportation and Installation of Offshore Facilities for Year 2014 – 2016 (Package A) |
2014 - 2015 |
PETRONAS Carigali Sdn Bhd |
- 16” x 44 km DALAK pipeline from Labuan PETRONAS METHANOL to SIPITANG Tee-off Project
- 34km pipe-lay by main work barge
- 6km shore approach (swampy area) installation
- 4km onshore pipeline installation
|
9 |
Transportation and Installation of Offshore Facilities for Year 2014 – 2016 (Package A) |
2014 |
PETRONAS Carigali Sdn Bhd |
Eight (8) nos. of SKO Riser Guards Project |
10 |
Transportation and Installation of Offshore Facilities for Year 2014 – 2016 (Package A) |
2014 |
PETRONAS Carigali Sdn Bhd |
DULANG Cables 3” x 4.5km DLG-B to DLG-C Project |
11 |
Provision of EVA-NMB Gas Delivery System (ENGDS) Shore Approach for PCSB Project |
2013 |
PETRONAS Carigali Sdn Bhd/ Global Offshore/ Malaysia Resources Sdn. Bhd. |
- Engineering support design and analysis
- Pre-installation and post installation survey
- Shore approach preparatory work i.e. construction/ installation of cofferdam, linear winch set-up & construction/ Installation of linear winch hold back wall and Beach Anchor Pile.
- Loading, securing and inland transportation of pipeline and associated components.
- Pipeline installation including beach pull activity.
|
12 |
Provision of Transportation & Installation of Topside for KEBABANGAN Northern Hub Development Project |
Feb 2011 - July 2014 |
KEBABANGAN Petroleum Operating Company |
- Transportation of KBB Topsides
- Topsides weighing approx. 17000 MT loadout weight,
- One (1) no. of Loadout Support Frame (LSF) weighing approx. 1500 MT,
- both together with a combined loadout weight of approximately 18500 MT from COMPANY’s fabrication loadout site to worksite
- Installation of KBB Topsides on the pre-installed substructure using floatover method by mating and ballasting the barge / vessel
Transportation of KBB Topsides
Topsides weighing approx. 17000 MT loadout weight
One (1) no. of Loadout Support Frame (LSF) weighing
approx. 1500 MT
both together with a combined loadout weight of
approximately 18500 MT from COMPANY’s fabrication loadout
site to worksite
Installation of KBB Topsides on the pre-installed
substructure using floatover method by mating and
ballasting the barge/vessel
|
13 |
Engineering, Procurement and Construction (EPC) of NPS 24 PRAI Lateral Subsea Pipeline Rectification Works Project |
Oct 2012 - Nov 2012 |
PETRONAS Gas Berhad |
- Rectification engineering/ design,
- Procurement of rocks and concrete mattress,
- Provision of marine spread for subsea pipeline rectification works.
- Repair damaged rock berms, fill up scouring area and free span correction for NPS 24 PRAI lateral subsea pipeline using rocks and concrete mattress.
|
14 |
Provision of 14” and 24” Export Pipeline Shore Approach Installation for KEBABANGAN Northern Hub Development |
2011 |
"KEBABANGAN Petroleum Operating Company/ Global Offshore/ Malaysia Resources Sdn. Bhd. |
- Provision of installation engineering & deliverables
- Provision of shallow draft barge & marine Spread
- Provision of line-pipe (s) transportation from Kuantan to field
- Provision of linear winch & accessories.
- Shore Approach Pipeline Installation including
- Construction of Beach-pull Preparatory Work i.e. Cofferdam, Linear Winch Hold Back Wall & Onshore Barge Anchor Wall.
- Setting up Linear Winch Spread,
- Laying of pipeline from landfall point
- Post-trenching Work
|
15 |
Transportation and Installation of Offshore Facilities for Year 2004 – 2006 (Extension) - Provision of Shore Approach Pipeline Installation for 28” dia from KAKG-A to MLNG2 |
2010 |
PETRONAS Carigali Sdn. Bhd./ TL Offshore Sdn Bhd |
- Provision of installation engineering & deliverables
- Provision of line-pipe (s) transportation from Kuantan to field
- Provision of linear winch & accessories.
- Shore approach pipeline installation including
- Construction of beach-pull preparatory work i.e. cofferdam, linear winch hold back wall & onshore barge anchor wall.
- Setting up linear winch spread
- Laying of pipeline from landfall point@ KP188.539 to KP182.300 – approx. 6.239km
- Installation of pipeline crossing@ KP182.886 – concrete sleepers/ mattresses
- Partial pre-commissioning
- Mid-point tie-in@ KP182.300
- Post-trenching work
- Rock-dumping work
|
16 |
Engineering, Procurement, Construction & Commissioning (EPCC) 10inch KEPONG A to TIONG A Sectional (Subsea) Pipeline Replacement |
2008 |
PETRONAS Carigali Sdn. Bhd./ PENINSULAR Malaysia Operation |
- De-oiling, clean and flood the entire pipeline length,
- Lay 450m long of pipeline next to existing pipeline
- Cut the existing pipeline
- Underwater measurement for spool fabrication
- Pipeline Spool fabrication,
- Installation of mechanical connector to the old cut pipeline and riser bottom section
- Installation of pipeline spools.
- Removal of 100m of existing pipeline – lift/ salvage 60m of KE-A side and 40m of TI-A side of the existing pipeline section.
- Pre-commissioning, commissioning and start-up
|
17 |
Procurement, Construction and Commissioning (PCC2) LGAST to PML-2 Pipeline Project – Shore Approach Section from Kg BELUKUT Shoreline (KP2.420) to Kg. Sg. KELING Shoreline (KP5.813) |
2007 |
PETRONAS Carigali Sdn. Bhd./ PETRONAS Methanol |
- Transportation of pipe & other appurtenances
- Supply & set-up 450MT linear winch spread on-board a shallow draft work barge
- Supply of shallow draft work barge c/w crane
- Pre-installation survey
- Project & general site management
- Pipeline route pre-trenching
- Construction of cofferdam
- Hydro-testing & pre-commissioning
- Pipeline post trenching work
- Pipeline post installation survey
- As-built documentation
|
18 |
Transportation and Installation of Offshore Facilities for Year 2004 – 2006 - Installation and Testing of Subsea High Tension Power Cable for BARAM South Development Project from BADP-A to BAKP-B (10.125km) and BAJT-H to BAKP-B (4.137km) |
Jan 2006 - Mar 2006 |
PETRONAS Carigali Sdn. Bhd./ TL Offshore Sdn Bhd |
- Perform pre-lay survey
- Removal of obstructing debris on seabed along the cable routes
- Installation of bitumen mattresses over pipeline crossings
- Installation of rigging equipment and tools i.e. pulling winch (Air TUGGER), chain blocks, air compressor at the BAKP-B, BADP-A & BAJT-H topside to facilitate cable installation equipment from singapore.
- Carry out deck strengthening work on MV TOISA Mariner in order to receive & transport two (2) cable tubs with approx. weight of 274MT and 126MT respectively.
- Assist in loading of two (2) lengths of 6.6kV composite cable & accessories onto the vessel and completed the tie- down and load-out activities.
- Transport the 6.6kV composite cable to BARAM field in miri together with installation equipment, crew and project team.
- Pulling cable at J-tube including length needed for termination (starting/ trailing end)
- Laying cable along the designated route
- Testing cable
- As-built report
|
19 |
Transportation and Installation of Offshore Facilities for Year 2004 – 2006 - West LUTONG Pipeline Replacement Project |
Nov 2005 - Dec 2006 |
PETRONAS Carigali Sdn. Bhd./ TL Offshore Sdn Bhd |
- Transport pipeline from Kuantan to location
- Install 18” x 10.188km WLDP-C/ MCOT pipeline
- Install 10” x 1.85km WLDP-C/ WLP-A pipeline
- Install 24” x 1.9km EFFLUENT PIPELINE
- Install riser based on “Stalk-on” method
- Fabricate/ install three (3) load bear clamp + six (6) slide Cclamp
- Pipeline pre-commissioning – clean, pigging, hydro-test & dewatering
- Remove and abandon pipeline (verify, identify, flush & removal)
|
20 |
Transportation and Installation of Offshore Facilities for Year 2004 – 2006 - Provision of 16inch BAP- AA/ MCOT Shallow Water/ Shore Approach Beach- Pull And Pipe-Laying |
Nov 2005 - Dec 2006 |
PETRONAS Carigali Sdn. Bhd. / TL Offshore Sdn Bhd |
- Preparation for shallow draft barge (SDB) beach-pull anchor pattern, including setting hold back wall at beach, construction/ installation of cofferdam & etc.
- Beach-pull of 350m pipeline string from landfall by shallow draft barge (SDB)
- Pipeline lay away up to laydown location at KP7.5 (WD – 10m)
- Beach-pull using 300MT LUCKER winch, setting up onshore (Pull from onshore to offshore)
|