1 |
Provision of Underwater Services For PETRONAS Carigali Sdn. Bhd. (Package 2 – 2 Years Contract) |
Aug 2016 - Aug 2018 |
PETRONAS Carigali Sdn. Bhd. |
- KUMANG KANOWIT subsea development project
- PL 47 section pipeline removal
- SKO BARONIA BNV-A caisson clamp installation
- SKG major platform inspection
- PLIDCO clamp installation (PL 190/ PL 293/ PL350/ PL 284/ PL 324/ PL 232)
- PL 87/ PL 065/ PL280 anode sled installation
- PL 224 pipeline and riser removal
- SMDP-B conductor guide installation
- Major platform inpections - ROV + riser guard maintenance
- Platform baseline inspection
- Leak investigation survey
- MLS inspection
- Riser clamp installation
- SAPL retrieval and LOW IR
- PL 080 - Pipeline sectional replacement + debris removal (additional SOW) PL300 - pipeline subsea tie - in inspection & debris survey (additional SOW)
- IFL retrieval
- CP recritification by air diver
|
2 |
Provision of Conductor Marine Growth removal Services for CENDOR-A Wellhead Platform |
May 2014 – Jun 2014 |
PETRONAS Carigali Sdn. Bhd. |
- Preparation of Work Packs including Inspection Planning and Program Reporting Software & Risk Assessment
- Managing the execution of Underwater activities
- Marine Growth Removal,
- Ultrasonic Thickness Measurement,
- CP Survey.
(Resources: ROV Support Vessel & Work Class ROV)
|
3 |
Provision of EPCC KEPONG A to TIONG A Sectional (Subsea) Pipeline Replacement Project |
Nov 2007 - Nov 2008 |
PETRONAS Carigali Sdn. Bhd. |
-
EPCC of 10” x 450m corroded subsea pipeline replacement near Kepong-A platform.
- Cutting/ removal of the existing pipeline
- Installation of mechanical connector - 600# rating with RTJ-R53 gasket
- 10"" Smart flange x 2nos;
- 10"" Misalignment flange - 2nos;
- installation of 10"" x 3nos tie-in spool (S-34m, L-28m/ 26m)
- Installation of tie-in protection (Resources: 4-point mooring work boat - Sea-Bulk Takzim, SAT Diving System and Work Class ROV System)
|